Osman Industries

Minutes of a Meeting between Representatives of

Osman Industries and Kuen Wah Maintenance

26 April 20-

Present:

James Clark, Assistant Safety Manager (Osman Industries) Chairman

Harry Fung, Inspection Engineer (Osman Industries) Secretary

Peter Koo, Maintenance Engineer (Kuen Wah Maintenance)

This meeting was held to look into the recent fire involving cooling tower 14 on  the roof of the Tongtian Building in Tsimshatsui, and to make arrangements with  Kuen Wah Maintenance regarding remedial work. Recommendations were also sought  to help avoid such incidents happening again.

Mr Fung described the background to the incident, and produced photographs to sh ow the scene of the incident at the Tongtian Building.

Discussion then took place about possible causes of the incident, and it was gen erally agreed that the most probable cause was vandalism. Mr Clark suggested tha t tougher security measures should be introduced to combat vandalism, and recomm ended that closed circuit television might help.

Then, discussion turned to the remedial work. Mr Koo agreed to carry out this wo rk the following Wednesday (1 May). He also suggested that flame retardant paint  could be applied to reduce the risk of another such incident, and offered to un dertake this work if required. Mr Clark replied that the matter would be conside red.

The possibility of introducting ADS fabricated cooling towers in the long term w as discussed, and it was agreed that a recommendation to this effect should be m ade to Senior Management.

Mr Clark concluded the meeting with a summary of the decisions reached.

 


 

 

文件名

会议记录

电子文件编码:

YW0304

序 码

3-2

Harry Fung

 

Harry Fung

Inspection Engineer


 

文件名

会议记录

电子文件编码:

YW0304

序 码

3-3

与会者:

奥斯曼实业公司保安部经理詹姆士·克拉克(会议主席)

奥斯曼实业公司检修工程师哈里·冯(会议秘书)

权华维修公司维修工程师彼得·古

本次会议的目的是就深圳通天大厦楼顶第14号冷却塔失火事件进行深入调查,并与权华维修公司共同安排抢修工作。会议还对防止此类事件再次发生提出了建议。

冯先生叙述了这次事件的背景,并出示了事发现场照片。

会议讨论了可能引起这次事故的原因。与会者普遍认为最大的可能性是人为的蓄意破坏。克拉克先生主张采取更严格的安全措施,加强防范,对付蓄意破坏的事件,并提议安装闭路电视。

接着会议安排了此次抢修工作。古先生同意在下个星期三(即五月一日)进行,并建议使用防火油漆,以减少再次引起此类事故的可能性。古先生提出在有需要时愿意承担此项工作。对此克拉克先生表示可以考虑。

会议还讨论了从长远来看,引进ADS组合型冷却塔的可能性。与会者一致认为这个提议应提交高级管理层考虑。

最后,克拉克先生就会议作出的决定进行了总结。

 

 